Asbestos Control Program (ACP7)
ACP7 form is an asbestos project notification. Any time asbestos abatement is perform on quantities greater than a minor project amount, the applicant has to file this form with DEP Asbestos Control Program (ACP). All asbestos documents are filed through the Asbestos Reporting and Tracking System (ARTS) E-file system. This system is web based and entirely paperless. All information on the ACP7 is essential to meet the requirements setforth in the asbestos rules and regulations Title15, Chapter 1 (RCNY). ACP enforcement staff utilizes this form for inspection of asbestos abatement activities.
Open in the graph · Relate this dataset · What these columns mean
Freshness
The publisher's promise
How the agency that publishes this data says it keeps the data current.
Fresh
- Says it updates
- Monthly
- Actually updates about every
- 30.5 days
- Publisher last updated the data
- Oct 1, 2026
Our mirror
Whether our copy of this data is current with the source.
In sync
- We last synced
- Oct 1, 2026, 4:33 PM
- Rows in our copy
- 406,103
- Rows at the source
- 406,103
- Our copy trails the source by
- under a minute
Columns
Each source column, with the name and type we use to store it.
3 of 35 columns carry a concept; 28 carry a description from the publisher. Read the concept column before you join. A column with no concept carries no claim from us, and a name that looks like a key is not one.
| Source field | Display name | What the publisher says it is | Concept | Source type | Stored as | Stored type | Row identifier | Unit |
|---|---|---|---|---|---|---|---|---|
longitude | LONGITUDE | The publisher describes this column nowhere. | Not bound | Number | longitude | numeric | — | |
floor | FLOOR | The name of the floor where the abatement project is located | Not bound | Text | floor | text | — | |
lot | LOT | Lot number of the facility where the abatement project is taking place Null if street activity= Yes | Not bound | Text | lot | text | — | |
block | BLOCK | Block number of the facility where the abatement project is taking place Null if street activity= Yes | Not bound | Text | block | text | — | |
section | SECTION | The section of the floor where the abatement project is located Null if EntireFloor= Yes | Not bound | Text | section | text | — | |
cross_street_between | CROSS_STREET_BETWEEN | The intersecting street at one end where the abatement project is located Null if street activity= No | Not bound | Text | cross_street_between | text | — | |
acm_amount | ACM_AMOUNT | The amount of the asbestos contained material |
Download
This file was produced on Oct 2, 2026, 10:01 PM.
Refresh this dataset
Source and attribution
Where this data comes from, which version we hold, and what we changed.
- Source
- https://data.cityofnewyork.us/d/vq35-j9qm
- Version
- Content hash:
4c424e53a17cb4ff6ac9821aad32c2937176349d34f84633c0df9c3fc05ae778 - What we changed
- We did not change the data. We stored it as published.
- Publisher
- codenownyc
- We retrieved it
- Oct 1, 2026, 4:33 PM
Update history
| Started | Kind | Result | Rows written | Produced by |
|---|---|---|---|---|
| Oct 1, 2026, 10:45 PM | full_replace | success | 406,103 | codenow-nycmesh-container-oci.jfrog.io/codenow/citytap-pull:0.1.84 |
| Oct 1, 2026, 9:25 PM | full_replace | failed | — | codenow-nycmesh-container-oci.jfrog.io/codenow/citytap-pull:0.1.84 |
| Sep 1, 2026, 9:52 PM | full_replace | success | 404,384 | codenow-nycmesh-container-oci.jfrog.io/codenow/citytap-pull:0.1.73 |
| Aug 29, 2026, 2:15 AM | full_replace | success | 395,278 | codenow-nycmesh-container-oci.jfrog.io/codenow/citytap-pull:0.1.73 |