Strategic Plan Progress Report
nja7-3m37
← What we have understood · Dataset page
- 7Fields catalogued
- Understood
- 0
- 0.0%
- A meaning was established for this field.
- Checked, no match
- 7
- 100.0%
- Somebody investigated and ruled the candidate meaning out. A result, not a gap.
- Not enough to tell
- 0
- 0.0%
- Somebody investigated and the evidence did not settle it.
- Nobody has looked
- 0
- 0.0%
- No verdict exists for this field yet.
Every field decided — Every field carries a verdict — which does not mean every field is understood.
Every field in this dataset
Covered and uncovered alike, in the order the publisher lists them. A field with no verdict is one nobody has looked at yet.
| Field | Type | What we know | Meaning | How it was decided | Shared term |
|---|---|---|---|---|---|
| baseline_measure_3q_2015Baseline Measure 3Q 2015 | Text | Checked, no match | — | dictionary_read Metric calculated for | — |
| metricMetric | Text | Checked, no match | — | value_domain_read top[8 of 20]={Customer Satisfaction Index×2; Telecom Site Visits Conducted by DoITT×1; M/WBEs in Contract×1; Average Duration of Requests in Intake…(clipped)×1; Agencies contributing to Technology So…(clipped)×1; Total Wi-Fi Access Points in Parks×1; Recruitment Efforts ×1; Scope Change Delays×1} | — |
| objectiveObjective | Text | Checked, no match | — | dictionary_read number and title from the DoITT Strategic Plan | — |
| _4q_2015_measure4Q 2015 Measure | Text | Checked, no match | — | dictionary_read Metric calculated for | — |
| kpi_definitionKPI Definition | Text | Checked, no match | — | dictionary_read Defintion of the KPI | — |
| goalGoal | Text | Checked, no match | — | dictionary_read number and title from the DoITT Strategic Plan | — |
| key_performance_indicatorKey Performance Indicator | Text | Checked, no match | — | value_domain_read top[8 of 20]={Customer Satisfaction Index×2; Telecom Site Visits Conducted by DoITT×1; M/WBEs in Contract×1; Average Duration of Requests in Intake…(clipped)×1; Agencies contributing to Technology So…(clipped)×1; Total Wi-Fi Access Points in Parks×1; Recruitment Efforts ×1; Scope Change Delays×1} | — |