CityTapNYC Open Data on tap

Interagency Coordination and Construction Permits Data (MOSYS)

wye7-nyek

← What we have understood · Dataset page

Understood
9
A meaning was established for this field.
Checked, no match
15
Somebody investigated and ruled the candidate meaning out. A result, not a gap.
Not enough to tell
32
Somebody investigated and the evidence did not settle it.
Nobody has looked
0
No verdict exists for this field yet.

Every field decided — Every field carries a verdict — which does not mean every field is understood.

Every field in this dataset

Covered and uncovered alike, in the order the publisher lists them. A field with no verdict is one nobody has looked at yet.

Every field in this dataset
FieldTypeWhat we knowMeaningHow it was decidedShared term
impacted_park_name_sImpacted Park Name(s)TextChecked, no match—
value_domain_read
top[8 of 20]={PROSPECT PARK WEST×12273; Flushing Meadows Corona Park×9964; Riverside Park×5709; Pelham Bay Park×5291; Van Cortlandt Park×4308; Crotona Park×3020; Bronx Park×2672; Mosholu Parkway×2656}
—
sponsoring_agency_entitySponsoring EntityTextChecked, no match—
value_domain_read
top[8 of 20]={DDC×228; Parks - Partner Group×86; SDOT×82; SCA×62; DEP×57; Private Developer×57; ConEd×56; CDOT×44}
—
boroughBoroughTextChecked, no match—
value_domain_read
—
address_intersectionAddress or IntersectionTextChecked, no match—
value_domain_read
top[8 of 20]={Multi-site×15; Merrick Blvd and Baisley Blvd×2; Intersection of Along Fort Hamilton Pa…(clipped)×2; Bronx River Avenue and East 172nd Stre…(clipped)×2; multi-site×2; Northern Blvd & 234 Street×2; (Sara D. Roosevelt Park) Chrystie & St…(clipped)×1; 58-26 47th Street in Maspeth, New York×1}
—
project_id_number_opProject ID Number OPTextChecked, no match—
value_domain_read
top[8 of 20]={M360×9; SANDRESM1×7; NYSDEC Site No. 224055×3; HB107014Q×3; HWPR19K2×2; HB107008Q×2; HBM1027×2; GXHP24-04×2}
—
multisite_projectMultisite Project? TextUnderstoodcategory.classificationPublisher classification
value_domain_read
top[3]={Single Site×747; Multi Site×120; Multi Borough×85}
—
project_received_dateProject Received DateCalendar dateNot enough to tell—
value_domain_read
—
project_description_typeProject DescriptionTextUnderstoodtext.free_textFree text note
value_domain_read
top[8 of 20]={Right-of-Way Bioswales×8; Sidewalk corner quadrant modification …(clipped)×7
—
permit_amendment_contentPermit Amendment ContentTextUnderstoodtext.free_textFree text note
value_domain_read
top[8 of 20]={Right-of-Way Bioswales×8; Sidewalk corner quadrant modification …(clipped)×7
—
construction_permit_special_conditionsConstruction Permit Special ConditionsTextUnderstoodtext.free_textFree text note
value_domain_read
top[8 of 20]={Right-of-Way Bioswales×8; Sidewalk corner quadrant modification …(clipped)×7
—
current_phaseCurrent PhaseTextUnderstoodcategory.statusWorkflow status
value_domain_read
top[5]={Construction×330; Presumed Complete×326; Final-Accepted (Closed Out)×193; Permitting×61; Conditional-Accepted (Subst. Compl.)×33}
—
primary_scope_of_workPrimary Scope of WorkTextNot enough to tell—
value_profile
—
final_inspection_dateFinal Inspection DateCalendar dateNot enough to tell—
value_domain_read
—
scoping_response_due_date_opScoping Response Due Date OPTextNot enough to tell—
value_domain_read
—
coordinatesCoordinatesTextUnderstoodgeometry.locationSpatial location
value_domain_read
smallest=40.516410, -74.232713 largest=40.906221, -73.878378
—
impacted_park_id_sImpacted Park ID(s)TextChecked, no match—
value_domain_read
top[8 of 20]={X003-ZN01×951; X003-ZN02×921; R065-ZN08×704; R065-ZN11×632; R031-ZN02×612; B082-ZN04×538; X010-ZN09×476; X010-ZN05×474}
—
construction_manager_company_opConstruction Manager Company OPTextChecked, no match—
value_domain_read
top[8 of 20]={DDC×228; Parks - Partner Group×86; SDOT×82; SCA×62; DEP×57; Private Developer×57; ConEd×56; CDOT×44}
—
impacted_parks_division_sImpacted Parks Division(s)TextChecked, no match—
value_domain_read
top[8 of 20]={Borough Operations×140; Borough Operations;#Borough Forestry×121; Borough Forestry×61; Greenthumb×26; Borough Operations;#Capital Projects×18; Conservancy×17; Borough Operations;#Planning and Parkl…(clipped)×13; CDOT Arterial Maintenance×13}
—
park_impact_typePark Impact TypeTextChecked, no match—
value_domain_read
top[8 of 20]={No Parkland Impact×126; Staging×61; Other×59; Sidewalk Closure×53; Access-Only×47; Park Improvement×44; Excavation×43; Staging;#Excavation×20}
—
contract_value_opContract Value ($) OPNumberNot enough to tell—
value_domain_read
—
design_consultant_opDesign Consultant OPTextUnderstoodactor.organizationOrganization
value_domain_read
top[8 of 20]={Dewberry×5; AECOM×3; AKRF×3; NV5×2; STV Inc.×2; Thornton Tomasetti, Inc.×1; RBA Group×1; Mathews Nielsen Landscape Architects×1}
—
mass_mailing_2_received_dateMass Mailing #2 Received DateTextNot enough to tell—
value_domain_read
—
mass_mailing_3_received_dateMass Mailing #3 Received DateCalendar dateNot enough to tell—
value_domain_read
—
construction_permit_idConstruction Permit IDTextChecked, no match—
value_domain_read
top[8 of 20]={M360×9; SANDRESM1×7; NYSDEC Site No. 224055×3; HB107014Q×3; HWPR19K2×2; HB107008Q×2; HBM1027×2; GXHP24-04×2}
—
design_completion_date_opDesign Completion Date OPCalendar dateNot enough to tell—
value_domain_read
—
construction_manager_opConstruction Manager OPTextChecked, no match—
value_domain_read
top[8 of 20]={EIC×40; RE×17; Resident Engineer×5; PM×4; Project Manager×3;
—
construction_kickoff_opConstruction KickoffCalendar dateNot enough to tell—
value_domain_read
—
expected_construction_end_date_opExpected Construction End Date OPCalendar dateNot enough to tell—
value_domain_read
—
actual_construction_end_date_opActual Construction End Date OPCalendar dateNot enough to tell—
value_domain_read
—
contractor_for_construction_permit_firm_nameContractor for Construction Permit Firm NameTextUnderstoodactor.organizationOrganization
value_domain_read
top[8 of 20]={Dewberry×5; AECOM×3; AKRF×3; NV5×2; STV Inc.×2; Thornton Tomasetti, Inc.×1; RBA Group×1; Mathews Nielsen Landscape Architects×1}
—
construction_permit_request_received_dateConstruction Permit Request Received DateCalendar dateNot enough to tell—
value_domain_read
—
latest_site_visitLatest Site VisitCalendar dateNot enough to tell—
value_domain_read
—
forestry_permit_id_numberForestry Permit ID NumberTextChecked, no match—
value_domain_read
top[8 of 20]={M360×9; SANDRESM1×7; NYSDEC Site No. 224055×3; HB107014Q×3; HWPR19K2×2; HB107008Q×2; HBM1027×2; GXHP24-04×2}
—
borough_approval_dateBorough Approval DateCalendar dateNot enough to tell—
value_domain_read
—
permit_issuance_datePermit Issuance DateCalendar dateNot enough to tell—
value_domain_read
—
permit_start_datePermit Start DateCalendar dateNot enough to tell—
value_domain_read
—
original_permit_expiration_dateOriginal Permit Expiration DateCalendar dateNot enough to tell—
value_domain_read
—
latest_permit_extension_amendment_request_dateLatest Permit Extension/Amendment Request DateCalendar dateNot enough to tell—
value_domain_read
—
latest_permit_extension_amendment_issuance_dateLatest Permit Extension/Amendment Issuance DateCalendar dateNot enough to tell—
value_domain_read
—
latest_permit_expiration_dateLatest Permit Expiration DateCalendar dateNot enough to tell—
value_domain_read
—
modifiedModifiedCalendar dateNot enough to tell—
value_profile
—
createdCreatedCalendar dateNot enough to tell—
value_domain_read
—
final_acceptance_of_park_by_boroughFinal Acceptance of Park by BoroughCalendar dateNot enough to tell—
value_domain_read
—
conditional_letter_issuedConditional Letter issuedCalendar dateNot enough to tell—
value_domain_read
—
punchlist_generatedPunchlist GeneratedCalendar dateNot enough to tell—
value_domain_read
—
latest_inspection_site_visitLatest Inspection Site VisitCalendar dateNot enough to tell—
value_domain_read
—
public_design_commission_approval_requiredPDC Approval RequiredTextChecked, no match—
value_domain_read
top[2]={No×91; Yes×18}
—
forestry_permit_statusForestry Permit StatusTextUnderstoodcategory.statusWorkflow status
value_domain_read
top[5]={Construction×330; Presumed Complete×326; Final-Accepted (Closed Out)×193; Permitting×61; Conditional-Accepted (Subst. Compl.)×33}
—
project_nameProject NameTextChecked, no match—
value_domain_read
top[8 of 20]={Right-of-Way Green Infrastructure - Ja…(clipped)×6; Complex Pedestrian Ramp Installation×5;
—
substantial_completion_date_opSubstantial Completion DateCalendar dateNot enough to tell—
value_domain_read
—
exploratory_permit_idExploratory Permit IDTextChecked, no match—
value_domain_read
top[8 of 20]={M360×9; SANDRESM1×7; NYSDEC Site No. 224055×3; HB107014Q×3; HWPR19K2×2; HB107008Q×2; HBM1027×2; GXHP24-04×2}
—
preliminary_public_design_commission_approvalPreliminary PDC ApprovalCalendar dateNot enough to tell—
value_domain_read
—
final_public_design_commission_approvalFinal PDC ApprovalCalendar dateNot enough to tell—
value_domain_read
—
final_acceptance_letter_dateFinal Acceptance Letter DateCalendar dateNot enough to tell—
value_domain_read
—
mass_mailing_1_received_dateMass Mailing #1 Received DateCalendar dateNot enough to tell—
value_domain_read
—
scoping_initiated_kick_off_opScoping Initiated/Kick-Off OPCalendar dateNot enough to tell—
value_domain_read
—